Rail Loading Expansion

Rail Loading Expansion

14 Spot Top Loading Rail Rack, Utah

JōB Industrial Services completed detailed engineering for a Rail Loading Expansion Project.

This is a sub-project of the Refinery Expansion Project.

Scope

  • Installation of new rail switch
  • Extend rail approximately 725 feet
  • New 14 spot top loading rack with loading arms
  • Vapor scrubbing system
  • Overfilled rail car unloader
  • Operator shelter, and associated utilities
14 Spot Top Loading Rail Rack, Utah

14 Spot Top Loading Rail Rack

14 Spot Top Loading Rail Rack, Utah

14 Spot Top Loading Rail Rack